Renovation Permits in Vancouver: What Homeowners Need to Know


Permits aren't the exciting part of a renovation. But skipping them — or not knowing when you need one — can create problems that are far more expensive and stressful than the permit itself. In Vancouver and surrounding municipalities, most kitchen and bathroom renovations that go beyond cosmetic changes require permits. Here's what you need to know before your project starts.
Do You Need a Permit?
The general rule: if you're changing anything structural, moving plumbing, or modifying electrical, you need a permit. Here's a quick reference:
Permit Required
- Moving or adding plumbing (relocating a sink, adding a shower, moving a toilet)
- Electrical changes (new circuits, panel upgrades, moving outlets)
- Structural modifications (removing or altering load-bearing walls)
- Gas line work (moving a gas range, adding a gas line)
- Adding or modifying windows and doors
- Changes affecting fire separations or exits
- Any work that changes the building envelope
Permit Generally Not Required
- Painting, wallpaper, and cosmetic finishes
- Replacing fixtures in the same location (same-spot faucet, toilet, light)
- Cabinet replacement without plumbing or electrical changes
- Flooring replacement (unless altering subfloor structure)
- Hardware and accessory updates
- Countertop replacement (no plumbing relocation)
When in doubt, call your local building department. It's a free question that can save you thousands. For kitchen renovations and bathroom renovations, the most common permit triggers are moving a sink (plumbing permit) and adding lighting or outlets (electrical permit).
Types of Renovation Permits
Building Permit
Required for structural changes — removing walls, altering floor plans, adding windows, or modifying the building envelope. This is the most involved permit type, often requiring engineering drawings and plans review. Cost: $500-$3,000+ depending on project scope.
Plumbing Permit
Required whenever you move, add, or modify plumbing supply or drain lines. Moving a kitchen sink 3 feet? Permit required. Adding a second bathroom? Permit required. Replacing a faucet in the exact same spot? No permit needed. Cost: $150-$500.
Electrical Permit
Required for new circuits, panel upgrades, outlet relocation, or any wiring modifications. Most kitchen and bathroom renovations need electrical permits because you're usually adding outlets, upgrading lighting, or running circuits for new appliances. In BC, electrical permits must be pulled by a licensed electrician. Cost: $100-$400.
Gas Permit
Required for any gas line work — moving a gas range, adding a gas fireplace, or modifying gas supply. Must be performed by a licensed gas fitter. Cost: $100-$300.
How to Apply for a Renovation Permit in Vancouver
The City of Vancouver has an online portal for permit applications. Here's the process:
- Prepare your documents. You'll need a scope of work description, floor plans (existing and proposed), and for structural changes, engineering drawings. Your contractor or designer typically prepares these.
- Submit online. Applications go through the City of Vancouver's development and building permits portal. Plumbing and electrical permits can often be applied for by your subtrades directly.
- Plans review. The city reviews your submission for code compliance. Simple projects (plumbing, electrical) may be approved quickly. Structural changes take longer.
- Permit issued. Once approved, the permit must be posted at the job site during construction.
- Inspections. The city conducts inspections at key stages — rough-in (before walls close up) and final. Your contractor coordinates these.
- Final sign-off. Once inspections pass, the permit is closed and your renovation is officially on record.
Permit Costs and Processing Times
- Plumbing permit$150 - $500 | 1-2 weeks
- Electrical permit$100 - $400 | 1-2 weeks
- Building permit (minor renovation)$500 - $1,500 | 2-4 weeks
- Building permit (structural changes)$1,000 - $3,000+ | 4-8 weeks
- Gas permit$100 - $300 | 1-2 weeks
Processing times vary by season. Summer is peak renovation season, and the permit office slows down accordingly. Submitting in late fall or winter often means faster processing.
What Happens If You Renovate Without a Permit
We get asked this a lot. "Can't I just skip the permit and save the hassle?" Here's what you're risking:
- Stop-work orders. If an inspector discovers unpermitted work in progress, they can issue a stop-work order. Your renovation halts until the permit is obtained — with penalties.
- Insurance problems. Unpermitted work can void your homeowner's insurance. If a plumbing leak from unpermitted plumbing causes water damage, your insurer can deny the claim.
- Resale complications. When you sell, home inspectors and buyers' lawyers check for permits. Unpermitted work must be disclosed. It can kill a sale, reduce your price, or require you to obtain retroactive permits — which means opening finished walls for inspection.
- Safety hazards. Permits exist because inspections catch dangerous work — improper wiring, inadequate plumbing venting, structural deficiencies. These aren't bureaucratic box-checking; they're genuine safety checks.
- Fines. The City of Vancouver can impose fines for unpermitted work, and the cost of retroactive permitting (including required inspections) typically exceeds what the original permit would have cost.
Permits in Surrounding Municipalities
Permit requirements and processes are similar across the Lower Mainland, but each municipality has its own department and fees:
- Burnaby: Online permit portal available. Similar fees and timelines to Vancouver. The city offers a fast-track option for simple plumbing and electrical permits.
- North Vancouver (City & District): Two separate jurisdictions with different requirements. The District tends to have longer processing times for building permits. Always confirm which jurisdiction your property falls under.
- Coquitlam & Port Moody: Tri-Cities area has its own building departments. Coquitlam processes permits relatively quickly. Port Moody is smaller and often faster.
- Richmond: Online portal with good turnaround times. Specific requirements for flood-plain areas (much of Richmond) may apply to basement renovations.
- Surrey & White Rock: Surrey is the largest municipality by area, and processing times can be longer during peak season. White Rock has its own building department separate from Surrey.
- Squamish: Smaller building department means more personal service but limited staff. Submit early and expect 2-4 weeks for most permits.
- West Vancouver: Stringent building requirements, particularly for heritage properties and properties in steep terrain. Expect longer review times for structural changes.
How Your Contractor Should Handle Permits
A good contractor handles the permit process as part of the project — not as an add-on you're expected to manage yourself. Here's what you should expect:
- Contractor advises which permits are needed for your specific scope
- Contractor or their licensed subtrades pull the permits
- Permit costs are included in the project quote (not a surprise add-on)
- Contractor schedules inspections at the right phases
- Contractor provides you with the final permit sign-off documentation
If a contractor suggests skipping permits to save time or money, that's a red flag. Legitimate contractors know that proper permitting protects both you and them.
Frequently Asked Questions
How long does a renovation permit take in Vancouver?
Simple plumbing and electrical permits: 1-2 weeks. Building permits for minor renovations: 2-4 weeks. Structural modifications requiring engineering review: 4-8 weeks. Submitting during off-peak months (October-February) typically results in faster processing.
Can my contractor pull permits for me?
Yes, and they should. Licensed contractors can pull building and plumbing permits on your behalf. Electrical permits in BC must be pulled by a licensed electrician (your contractor's electrical subtrade). Gas permits must be pulled by a licensed gas fitter. A well-organized contractor handles all of this as part of the project.
Do I need a permit for a condo renovation?
The same rules apply. You need permits for the same scope of work regardless of whether it's a house or a condo. Condos add an additional layer: strata council approval, which is separate from the municipal permit. You need both before work begins.
What if previous work was done without a permit?
You can apply for a retroactive permit. The municipality will require an inspection of the existing work, which may mean opening walls. If the work doesn't meet code, you'll need to bring it up to standard. This is a common issue in older Vancouver homes that have been renovated multiple times over the decades.
Do permits add to the cost of my renovation?
Yes, but modestly. For a typical kitchen or bathroom renovation, expect $500-$2,000 in total permit fees. This is a small fraction of the total project cost and protects your investment, your insurance, and your resale value. It's one of the few renovation costs that pays for itself.
Questions About Permits for Your Project?
We handle the permit process for every renovation we manage — from application to final sign-off. If you're planning a kitchen or bathroom renovation and want to understand what's involved, contact us for a free consultation. We'll assess your project scope, let you know exactly which permits you'll need, and include the full cost in your quote.
Share this article
Ready to Get Started?
Contact us for a free consultation and quote for your renovation project.
Request A Free QuoteWritten by Larsen
Professional finishing carpenter with over 10 years of experience in kitchen and bathroom renovations across Vancouver.